UNDERBOLD-POD30 · Soil stabilisation

From soil
to road.

UNDERBOLD-POD30 is worked into the existing soil. After compaction, cement is added. The result is the road’s base course.

  1. PreparationThe grader prepares the area.
  2. Step 1The tanker and stabiliser work in UNDERBOLD.
  3. Step 2The roller carries out intermediate compaction.
  4. Steps 3 and 4Cement is spread and mixed in.
  5. Step 5The grader and roller shape and compact.
  1. PreparationSite preparation
  2. 01Working in UNDERBOLD
  3. 02Intermediate compaction
  4. 03–04Spreading and mixing in cement
  5. 05Shaping and compaction

40 cm

Bound base course.
Made from the soil that was already there.

In-situ soil. Stays where it is.

What is UNDERBOLD-POD30?

An organic wax emulsion that binds the existing soil into the base course of a road.

  • Material

    Wax and water

    Around 30% wax and emulsifier, around 70% water.

  • What it does

    Binds the soil

    Mixed in and bound with cement: 40 cm of water-repellent base course.

  • Where it comes from

    Made in Germany

    Developed and manufactured in Germany. In use for over 20 years.

Who is behind UNDERBOLD-POD30

More road from
the same budget.

You build without replacing the soil.

The product in detail

▶The process on video · 2:31 min · with sound

Where the process can be used

  1. Municipal and urban roads

    Renew residential streets without long road closures.

  2. Farm and forest tracks

    Tracks that carry harvests and timber.

  3. Industrial and haul roads

    For heavy traffic on industrial sites.

  4. Logistics, storage and hardstanding areas

    Large areas stabilised in a short time.

  5. Mine and quarry roads

    Roads built to carry heavy loads.

  6. Military and emergency access roads

    Built fast where every day counts.

What you leave out.

The existing soil is used on site. Excavation, haulage and imported material may no longer be needed.

No excavation.

The existing soil is not excavated. It is the construction material.

Not needed

No haulage.

What is not excavated does not have to be hauled away and disposed of at landfill.

Not needed

No imported material.

No crushed stone is hauled in to replace excavated soil.

Not needed

What remains: the soil. And a machine train that binds it.

Environmental benefits

Smaller crews. Shorter build times.

The same kilometre of road foundation, calculated twice.

Staff per kilometre

Conventional

16people

UNDERBOLD-POD30

6people

10fewer people

Road foundation build time

Conventional

10days

1 2 3 4 5 6 7 8 9 10

UNDERBOLD-POD30

2days1

1 2 3 4 5 6 7 8 9 10

8days sooner

Worked example

1 Worked example for 1 km of road foundation. Construction time depends on soil, area and plant deployment.

Economic benefits

One machine train.
Five steps.

Construction uses a stabiliser or recycler, cement spreader, grader and roller. Two separate passes: always UNDERBOLD-POD30 first, then cement.

  1. 01Tanker with stabiliser

    Working in UNDERBOLD

    On the prepared area, UNDERBOLD-POD30, diluted with water, is mixed in to full depth in a single pass.

    min. 0.40 l of concentrate per m²

  2. 02Roller, min. 16 t

    Intermediate compaction

    The treated layer is compacted before the second pass begins.

  3. 03Cement spreader

    Spreading cement

    The cement is spread on the compacted layer.

    3 to 5% cement

  4. 04Stabiliser

    Mixing in cement

    The cement is mixed in. First UNDERBOLD-POD30, then cement – never mixed together.

  5. 05Grader, roller

    Shaping and compaction

    Fine grading with the grader, final compaction with the roller. The base course is finished.

    40 cm depth

  6. Testing the bearing capacity on the finished area
    ✓Testing on site

    Finished and tested

    The bearing capacity is measured on site. The surfacing follows.

Step 1 of 5

The pavement is designed for each project according to soil and traffic loading.

Download the application guide PDF · 8 pages · every working step with the machines required

The process in detail

One road.
Three reasons.

up to40%savings

Built up to 5 times faster, with less material and fewer haulage trips.

See all benefitsWe provide evidence and test reports.

New in our range · AsphaltX

Bound below.
Reinforced above.

UNDERBOLD-POD30 turns the soil into the base course. AsphaltX reinforces the asphalt above it with Twaron® fibres, added at the mixing plant. Two products, one pavement.

  • TopThe fibre carries tensile forces. In the lab, rut depth was halved, from 4.9 to 2.5 mm.
  • BottomThe bound base course made from the existing soil, 40 cm thick.

AsphaltX in detail

ASPHALTWITH ASPHALTX UNDERBOLD-POD3040 cm

16 countries.
One process.

Project examples from 16 countries: from municipal roads to heavy-duty access roads.

01 / 16 countries

Brazil

    See all projects

    Have your soil tested.

    1. 01

      You send us the project data.

    2. 02

      We check suitability: soil, loading and pavement structure.

    3. 03

      You receive a recommendation with the right pavement structure.