No excavation.
The existing soil is not excavated. It is the construction material.
40 cm
Bound base course.
Made from the soil that was already there.
In-situ soil. Stays where it is.
An organic wax emulsion that binds the existing soil into the base course of a road.
Material
Around 30% wax and emulsifier, around 70% water.
What it does
Mixed in and bound with cement: 40 cm of water-repellent base course.
Where it comes from
Developed and manufactured in Germany. In use for over 20 years.
You build without replacing the soil.
Renew residential streets without long road closures.
Tracks that carry harvests and timber.
For heavy traffic on industrial sites.
Large areas stabilised in a short time.
Roads built to carry heavy loads.
Built fast where every day counts.
The existing soil is used on site. Excavation, haulage and imported material may no longer be needed.
The existing soil is not excavated. It is the construction material.
What is not excavated does not have to be hauled away and disposed of at landfill.
No crushed stone is hauled in to replace excavated soil.
What remains: the soil. And a machine train that binds it.
The same kilometre of road foundation, calculated twice.
Conventional
16people
6people
10fewer people
Conventional
10days
2days1
8days sooner
Worked example
1 Worked example for 1 km of road foundation. Construction time depends on soil, area and plant deployment.
Construction uses a stabiliser or recycler, cement spreader, grader and roller. Two separate passes: always
On the prepared area,
min. 0.40 l of concentrate per m²
The treated layer is compacted before the second pass begins.
The cement is spread on the compacted layer.
3 to 5% cement
The cement is mixed in. First
Fine grading with the grader, final compaction with the roller. The base course is finished.
40 cm depth
The bearing capacity is measured on site. The surfacing follows.
The pavement is designed for each project according to soil and traffic loading.
up to40%savings
Built up to 5 times faster, with less material and fewer haulage trips.
after72hours fully trafficable
40 cm bound base course, water-repellent. A road built in 2008 shows no settlement after around eleven years.
Trial section 2011Bearing capacity measured
up to74%less CO₂
An organic wax emulsion binds the soil, which stays on site. When the area is no longer needed, it can be broken up and re-vegetated.
See all benefitsWe provide evidence and test reports.
New in our range · AsphaltX
Project examples from 16 countries: from municipal roads to heavy-duty access roads.
01 / 16 countries
You send us the project data.
We check suitability: soil, loading and pavement structure.
You receive a recommendation with the right pavement structure.