Benefits
One road.
Three reasons.
Three figures. Where they come from and what they cover: see Resources.
01Economic
up to40%savings compared with the conventional pavement structure
The soil that is already there becomes the base course.
up to5 timesfaster to build
Where the savings come from
-
AMaterial
66–90 to 46–50 cm
Guide values
-
BTransport
- Excavation
- Haulage
- Imported material
3 to 0 items
How the process works
-
CStaff
16 to 6 people
Illustrative example
-
DConstruction time
10 to 2 days
Illustrative example
A guide value, not a guarantee. The savings arise where soil would otherwise be replaced.Basis
02Technical
Measured on the
finished layer.
Three tests on completed areas. The measurements were taken by external testing bodies, not by us.
Trial section 2011Bearing capacity measured
-
Bearing capacity
296 MN/m²
Trial section, one day after construction.
Reference value 1800higher is better →
-
Frost
3.1%
Mass loss on cores from a completed road.
Limit value 10%0← lower is better
-
Strength
4.59 N/mm²
Compressive strength of the same road after 28 days.
Requirement 1.8–3.00N/mm²
From day one to year eleven
Day 1
296 MN/m² on the trial section.
After 72 hours
The base course is fully trafficable.
Day 28
4.59 N/mm² on cores.
Year 6
No rehabilitation. Client’s statement.
Year 11
No settlement. Letter from the contractor.
The process has been in use for over 20 years.Basis
03Environmental
up to74%less CO₂ in the model calculation
Compared with removal and rebuild of the base course.
compared with an in-situ cement-bound base, up to33%less
What else is documented
The soil stays on site.
How the process works
Wax and water.
Safety data sheet
Eluate tested.
Accredited laboratory, 2023
Mineralogically tested.
University expert report, 2026
Model calculation, not independently verified.BasisWhat stays in the soil
Your road
in figures.
Set the length and width, and the quantities update.
- Soil that stays on site
- 2,400 m³
- becomes the 40 cm base course
UNDERBOLD-POD30 - min. 2,400 l
- Concentrate, 0.40 l per m²
- Cement
- 115–144 t
- at 3%, depending on soil density
- Construction of the base course
- approx. 3 working days
- at 2,500 m² per crew per day
Imported layer material, excluding cement and concentrate
Conventional
3,960–5,400 m³
360–600 m³
Conventional: 66–90 cm in five layers. With
Guide values for a depth of 40 cm, based on the minimum dosage and the indicative pavement structure. They do not replace pavement design.
A suitability test on your soil sample determines dosage, pavement structure and price.
Your soil.
Your project.
Send us your project data. We check suitability and recommend the right pavement structure.