01Economic

up to40%savings compared with the conventional pavement structure

The soil that is already there becomes the base course.

up to5 timesfaster to build

Where the savings come from

  1. AMaterial

    66–90 to 46–50 cm

    Guide values

  2. BTransport

    • Excavation
    • Haulage
    • Imported material

    3 to 0 items

    How the process works

  3. CStaff

    16 to 6 people

    Illustrative example

  4. DConstruction time

    10 to 2 days

    Illustrative example

A guide value, not a guarantee. The savings arise where soil would otherwise be replaced.Basis

02Technical

Measured on the
finished layer.

Three tests on completed areas. The measurements were taken by external testing bodies, not by us.

TÜV RheinlandTrial section 2011Bearing capacity measured

  1. Bearing capacity

    296 MN/m²

    Trial section, one day after construction.

    0higher is better →

  2. Frost

    3.1%

    Mass loss on cores from a completed road.

    0← lower is better

  3. Strength

    4.59 N/mm²

    Compressive strength of the same road after 28 days.

    0N/mm²

From day one to year eleven

  1. Day 1

    296 MN/m² on the trial section.

  2. After 72 hours

    The base course is fully trafficable.

  3. Day 28

    4.59 N/mm² on cores.

  4. Year 6

    No rehabilitation. Client’s statement.

  5. Year 11

    No settlement. Letter from the contractor.

The process has been in use for over 20 years.Basis

03Environmental

up to74%less CO₂ in the model calculation

Compared with removal and rebuild of the base course.

compared with an in-situ cement-bound base, up to33%less

What else is documented

  • The soil stays on site.

    How the process works

  • Wax and water.

    Safety data sheet

  • Eluate tested.

    Accredited laboratory, 2023

  • Mineralogically tested.

    University expert report, 2026

Model calculation, not independently verified.BasisWhat stays in the soil

Your road
in figures.

Set the length and width, and the quantities update.

1,000 m

100 m10 km

6 m

3 m12 m

Area6,000 m²

Soil that stays on site
2,400 m³
becomes the 40 cm base course
UNDERBOLD-POD30
min. 2,400 l
Concentrate, 0.40 l per m²
Cement
115–144 t
at 3%, depending on soil density
Construction of the base course
approx. 3 working days
at 2,500 m² per crew per day

Imported layer material, excluding cement and concentrate

Conventional

3,960–5,400 m³

UNDERBOLD-POD30

360–600 m³

Conventional: 66–90 cm in five layers. With UNDERBOLD-POD30, only surfacing and bond coat, 6–⁠10 cm.

Guide values for a depth of 40 cm, based on the minimum dosage and the indicative pavement structure. They do not replace pavement design.

A suitability test on your soil sample determines dosage, pavement structure and price.

Get in touch Reply within two working days

Your soil.
Your project.

Send us your project data. We check suitability and recommend the right pavement structure.

Reply within two working days